Sub-System Integration

Sub-System Integration

Test-Bed integration facilities

PSK Wind Technology Constructed a very unique and powerful Test Bed with false floor and all the facilities to reduce significantly the overall time schedule for turnkey projects like station\shelter implementation, integration, testing and delivery.

The Test Bed enable us to work in parallel. To build the station\shelter construction and simultaneously and in parallel within the Test Bed to setup and assemble the overall racks and work stations in the same layout and configuration as designed within the station\shelter. The overall equipment will be assembled within the racks and once the wiring is completed the end-to-end system will be integrated and tested

once both station\shelter and the system are ready, the system bill be transferred to the station\shelter, the overall system tested again to verify the overall system and then the customer invited for final ATP

SHARE THE INFORMATION

Contact Us

Contact Us

CONTACT FORM
  • This field is for validation purposes and should be left unchanged.
Font Resize
Contrast