Constructed a very unique and powerful Test Bed with false floor and all the facilities to reduce significantly the overall time schedule for turnkey projects like station\shelter implementation, integration, testing and delivery.
The Test Bed enable us to work in parallel. To build the station\shelter construction and simultaneously and in parallel within the Test Bed to setup and assemble the overall racks and work stations in the same layout and configuration as designed within the station\shelter. The overall equipment will be assembled within the racks and once the wiring is completed the end-to-end system will be integrated and tested.
once both station\shelter and the system are ready, the system bill be transferred to the station\shelter, the overall system will be tested again to verify the overall system is functioning and then the customer is welcome invited for final ATP.